AbouRizk, S M and Dozzi, S P (1993) Application of Computer Simulation in Resolving Construction Disputes. Journal of Construction Engineering and Management, 119(02), 355–73.

Barnes, W C (1993) Microcomputers in Management of Construction Operations. Journal of Construction Engineering and Management, 119(02), 403–12.

Bernold, L E and Salim, M (1993) Placement‐Oriented Design and Delivery of Concrete Reinforcement. Journal of Construction Engineering and Management, 119(02), 323–35.

Carr, R I (1993) Cost, Schedule, and Time Variances and Integration. Journal of Construction Engineering and Management, 119(02), 245–65.

East, E W and Kim, S (1993) Standardizing Scheduling Data Exchange. Journal of Construction Engineering and Management, 119(02), 215–25.

  • Type: Journal Article
  • Keywords: Computer software; Construction; Scheduling; Critical path method; Information systems; Standardization; Data processing; Government agencies;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(1993)119:2(215)
  • Abstract:
    One of the major inefficiencies in the use of the critical path method (CPM) in the construction industry is the large number of proprietary and commercially available software scheduling systems. This inefficiency is due, in part, to the amount of data reentry required when progress data is exchanged between members of a project team. To solve this problem, the U.S. Army Corps of Engineers coordinated the development of a data‐exchange standard with eight vendors, several construction managers, and Corps of Engineer field‐office representatives. The standard was tested on a limited basis and has been officially required by the Corps of Engineers since March of 1990. To use the data‐exchange features currently provided by software vendors, it is necessary for all participants in the data exchange to spend considerable time anticipating inconsistencies between software systems. A revised version of the format is expected to be released to vendors in early 1993. The revised version is expected to considerably reduce the time required by users to implement the exchange of project scheduling data.

Ioannou, P G and Liu, L Y (1993) Advanced Construction Technology System—ACTS. Journal of Construction Engineering and Management, 119(02), 288–306.

McCullouch, B G and Gunn, P (1993) Construction Field Data Acquisition with Pen‐Based Computers. Journal of Construction Engineering and Management, 119(02), 374–84.

Miyatake, Y and Kangari, R (1993) Experiencing Computer Integrated Construction. Journal of Construction Engineering and Management, 119(02), 307–22.

Russell, A D (1993) Computerized Daily Site Reporting. Journal of Construction Engineering and Management, 119(02), 385–402.

Russell, A D and Wong, W C M (1993) New Generation of Planning Structures. Journal of Construction Engineering and Management, 119(02), 196–214.

Tommelein, I D and Zouein, P P (1993) Interactive Dynamic Layout Planning. Journal of Construction Engineering and Management, 119(02), 266–87.

Vanegas, J A, Bravo, E B and Halpin, D W (1993) Simulation Technologies for Planning Heavy Construction Processes. Journal of Construction Engineering and Management, 119(02), 336–54.

Yates, J K (1993) Construction Decision Support System for Delay Analysis. Journal of Construction Engineering and Management, 119(02), 226–44.